Monday 24 June 2013

Evaluation

For our transition from AS media to A2 we were asked to recreate a 1 minute of an existing music video, we chose to do ‘Frank Turner – The way I tend to be’. This was chosen because of the location and costume being quite simple so we thought we’d be able to do it more successfully compared to if we tried a more difficult one. Although we didn’t consider the amount of shots needed in the first minute so if we did it again I’d want to chose a video with less shots in the first minute for example like the Snow Patrol chasing cars video which has fewer shots and also uses a simple location. We didn’t choose this video in the first place as we thought we’d be able to do the Frank Turner one without a problem. We also encountered problems with the storyboard as it was missing a few shots when we took it out as a reference when we went filming so we had to improvise a few shots in the editing with the footage we had taken doubles of just in case some had gone wrong.  Another problem we encountered was when our main actor Connor turned up for the last 7 shots of filming in the wrong clothing we needed for the filming so once again we had to change it slightly. We had to stop originally filming when we tried to get it all filmed in one shoot but we had to stop 7 shots short when it started to rain and because of the fact we were in a field we had to move quickly to avoid getting any rain on us or the equipment. We also had problems with our actual team as Connor wasn’t here one of the days we needed him to bring in the files we needed or he’d turn up late to filming in the wrong costume. Ford wasn’t here two of the days so with people being off on different days it made it quite hard to do some of the filming and editing at times.  The video itself was a little bit dark in a few shots which if we tried to recreate it I’d want to sort this out.

So even though we had quite a few problems with filming etc I still think we did quite well in the editing as when we played it against the actual music video to check the timing it matched up quite well with each other, along with this we made sure the shots in which Connor had to sing matched up with the lines in the song.  I also think that the planning and preparation went quite well as it we got it all done quite quickly and without too many problems.
So overall I enjoyed the project even if it turned out to be quite problematic at times but I am quite happy with out final project and we even had enough footage left over to make a bloopers reel.

Thursday 13 June 2013

Shooting Schedule part 2

Due to it starting to rain we tried to shoot on 11/6/13 we have to extend the shoot to the 13/6/13 to get the last seven shots which we were unable to get before. So we need to bring all the props from the previous shoot and Connor needs to wear the same costume.

Saturday 8 June 2013

Group Roles

Hannah Palmer -  Lyrics, shot durations & constructing sign needed for the video.

Rosie Thompson - Costumes, Mise-en-scene, Long haired girl role & Bringing shovel.

Connor Carter - Project Manager, Main role & construct storyboard.

Ford Walton - Constructing storyboard & Filming.